Staff

Bermawi Priyatna Iskandar


Guru Besar

Nama : Prof.Ir. Bermawi Priyatna Iskandar M.Sc.,Ph.D.
Kelompok Keahlian : Sistem Manufaktur
Sekolah / Fakultas : FTI
Jabatan Fungsional : Guru Besar
S1 ITB Bandung Indonesia 1981
SLTP SMP Sumbangsih Jakarta Indonesia 1970
SLTA SMAN X Jakarta Indonesia 1973
S2 ITB Bandung Indonesia 1985
S3 The University of Queensland Queensland Autralia 1993
SD SD Sumbangsih Jakarta Indonesia 1967
  • KONTRAK PEMELIHARAAN ALAT BERAT MELIBATKAN TIGA PIHAK - PEMANUFAKTUR, AGEN DAN KONSUMEN DALAM SITUASI KOMPETITIF/KOOPERATIF (2017)
  • MODEL LAYANAN PURNA JUAL UNTUK ALAT BERAT REMANUFAKTUR (2017)
  • Kontrak pemeliharaan alat berat melibatkan tiga pihak -pemanufaktur, agen dan konsumen dalam situasi kompetisi/kooperasi (2016)
  • Kontrak Pemeliharaan Alat Berat Melibatkan Tiga Pihak Pemanufaktur, Agen dan Konsumen Dalam Situasi Kompetitif/Kooperatif (2016)
  • PEMODELAN KONTRAK PEMELIHARAAN TERINTERGRASI UNTUK ALAT BERAT DI PERTAMBANGAN (2016)
  • Indonesia Coast Guard Academy (ICGA) (2015)
  • Kontrak Pemeliharaan Armada Alat Berat Pada Industri Pertambangan ( Lanjutan) (2015)
  • Pemodelan Kontrak Pemeliharaan Terintegrasi Untuk Alat Berat di Pertambangan (2015)
  • Sosialisasi dan Promosi Seleksi Nasional Masuk Perguruan Tinggi Negeri Tahun 2015 (2015)
  • Kontrak Pemeliharaan Armada Alat Berat pada Industri Pertambangan (2014)
  • Kontrak Pemeliharaan Berbasis Performansi untuk Alat Berat (2014)
  • Management Proyek, Dana Kas Operasional Kantor Pengembangan ITB - JICA (DIPA) (2014)
  • Pemberian Bantuan Dana Riset Mobil Listrik Nasional (2014)
  • Pemodelan dan analisis kontrak pemeliharaan alat berat pada tambang terbuka batu bara dengan mempertimbangkan faktor beban/penggunaan dan waktu (perioda Kontrak) (2013)
  • Strategi perbaikan dan pemeliharaan pencegahan untuk meminimumkan ongkos garansi produk otomotif (2013)
  • Swakelola Analisa Rekomendasi Posisi Runding Dalam Bentuk Position Paper Mengenai Penyusunan Barang-Barang Lingkungan Indonesia (2013)
  • Technology deveopment for the biological production of dodecanedioic acid from the plantderived long-chain fatty acid (2013)
  • Keputusan Optimal untuk Kontrak Pemeliharaan Alat Berat yang Dipergunakan pada Industri Pertambangan (2012)
  • Pendekatan Terintegrasi untuk Pengurangan Ongkos Garansi (2011)
  • Dua Strategi Layanan Garansi Baru Untuk Produk Yang Dijual Dengan Garansi Satu Dimensi (2010)
  • Husniah, H., Cakravastia, A., Iskandar, B.P., Pasaribu, U.S. (2016) Modelling and analysis of maintenance contract with imperfect preventive maintenance, Proceedings of the 2015 International Conference on Technology, Informatics, Management, Engineering and Environment, TIME-E 2015, Art. No. 7389742, pp. 25-30. DOI: 10.1109/TIME-E.2015.7389742(Internasional)
  • Husniah, H., Iskandar, B.P. (2016) Modelling two-dimensional lease contract with preventive maintenance and servicing strategy, Jurnal Teknologi, Vol. 78, Issue 42527, pp. 19-25. DOI: 10.11113/jt.v78.9016(Internasional)
  • Husniah, H., Pasaribu, U.S., Iskandar, B.P. (2016) Optimal preventive maintenance for a fleet of dump trucks with two-dimensional lease contract, IEEE International Conference on Industrial Engineering and Engineering Management, Vol. 2016-January, Art. No. 7385812, pp. 1067-1071. DOI: 10.1109/IEEM.2015.7385812(Internasional)
  • Husniah, H., Pasaribu, U.S., Iskandar, B.P. (2016) Two dimensional maintenance contract with coordination between owner and agent, IEEE International Conference on Industrial Engineering and Engineering Management, Vol. 2016-December, Art. No. 7797929, pp. 516-520. DOI: 10.1109/IEEM.2016.7797929(Internasional)
  • Iskandar, B.P., Husniah, H. (2016) On the application of copula in modeling maintenance contract, IOP Conference Series: Materials Science and Engineering, Vol. 114, Issue 1, Art. No. 12085. DOI: 10.1088/1757-899X/114/1/012085(Internasional)
  • Pakpahan, E.K.A., Iskandar, B.P. (2016) Optimal maintenance service contract involving discrete preventive maintenance using principal agent theory, IEEE International Conference on Industrial Engineering and Engineering Management, Vol. 2016-January, Art. No. 7385809, pp. 1051-1055. DOI: 10.1109/IEEM.2015.7385809(Internasional)
  • Pakpahan, E.K.A., Iskandar, B.P. (2016) Performance based lease contract involving discrete preventive maintenance, ARPN Journal of Engineering and Applied Sciences, Vol. 11, Issue 16, pp. 10009-10013. (Internasional)
  • Husniah, H., Pasaribu, U.S., Iskandar, B.P. (2015) Service contract management with availability improvement and cost reduction, ARPN Journal of Engineering and Applied Sciences, Vol. 10, Issue 1, pp. 146-151. (Internasional)
  • Husniah, H., Supriatna, A.K., Iskandar, B.P. (2015) Improving service contract management with availability and negotiation, Interdisciplinary Behavior and Social Sciences-Proceedings of the 3rd International Congress on Interdisciplinary Behavior and Social Sciences, ICIBSoS 2014, pp. 409-413. (Internasional)
  • Iskandar, B.P., Cakravastia, A., Husniah, H. (2015) Optimal preventive maintenance for a two dimensional lease contract, Proceedings-CIE 45: 2015 International Conference on Computers and Industrial Engineering. (Internasional)
  • Iskandar, B.P., Cakravastia, A., Pasaribu, U.S., Husniah, H. (2015) Performance-based maintenance contract for a fleet of dump trucks used in mining industry, Proceedings of 2014 2nd International Conference on Technology, Informatics, Management, Engineering and Environment, TIME-E 2014, Art. No. 7011603, pp. 117-122. DOI: 10.1109/TIME-E.2014.7011603(Internasional)
  • Pakpahan, E.K.A., Iskandar, B.P. (2015) Maintenance service contract model for heavy equipment in mining industry using principal agent theory, AIP Conference Proceedings, Vol. 1692, Art. No. 20029. DOI: 10.1063/1.4936457(Internasional)
  • Husniah, H., Pasaribu, U.S., Cakravastia, A., Iskandar, B.P. (2014) Performance-based maintenance contract for equipments used in mining industry, ICMIT 2014-2014 IEEE International Conference on Management of Innovation and Technology, Art. No. 6942485, pp. 543-548. DOI: 10.1109/ICMIT.2014.6942485(Internasional)
  • Husniah, H., Pasaribu, U.S., Cakravastia, A., Iskandar, B.P. (2014) Two dimensional maintenance contracts for a fleet of dump trucks used in mining industry, Applied Mechanics and Materials, Vol. 660, pp. 1026-1031. DOI: 10.4028/www.scientific.net/AMM.660.1026(Internasional)
  • Iskandar, B.P., Husniah, H., Pasaribu, U.S. (2014) Maintenance service contracts for equipment sold with two dimensional warranties, Quality Technology and Quantitative Management, Vol. 11, Issue 3, pp. 321-333. (Internasional)
  • Iskandar, B.P., Pasaribu, U.S., Cakravastia, A., Husniah, H. (2014) Maintenance service contracts for a fleet of dump trucks used in mining industry, CIE 2014-44th International Conference on Computers and Industrial Engineering and IMSS 2014-9th International Symposium on Intelligent Manufacturing and Service Systems, Joint International Symposium on The Social Impacts of Developments in Information, Manufacturing and Service Systems-Proceedings, pp. 2480-2491. (Internasional)
  • Soemadi, K., Iskandar, B.P., Taroepratjeka, H. (2014) Optimal overhaul-replacement policies for a repairable machine sold with warranty, Journal of Engineering and Technological Sciences, Vol. 46, Issue 4, pp. 465-483. DOI: 10.5614/j.eng.technol.sci.2014.46.4.9(Internasional)
  • Hadi, A.K., Ashad, H., Jusoff, K., Iskandar, B.P., Basri, L. (2013) Optimization of fly ash and silica fume as materials subtitution for cement with ternary sistem C-A-S, World Applied Sciences Journal, Vol. 26, Issue 26, pp. 24-30. DOI: 10.5829/idosi.wasj.2013.26.nrrdsi.26005(Internasional)
  • Husniah, H., Pasaribu, U.S., Iskandar, B.P. (2013) A servicing strategy involving imperfect repair for two-dimensional warranties, Proceedings of 2013 3rd International Conference on Instrumentation, Control and Automation, ICA 2013, Art. No. 6734087, pp. 280-285. DOI: 10.1109/ICA.2013.6734087(Internasional)
  • Husniah, H., Pasaribu, U.S., Iskandar, B.P. (2013) A servicing strategy involving preventive maintenance and imperfect repair for two dimensional warranties, Proceedings of International Conference on Computers and Industrial Engineering, CIE, Vol. 1, pp. 400-410. (Internasional)
  • Iskandar, B.P., Pasaribu, U.S., Husniah, H. (2013) Performanced based two maintenance contracts for equipment sold with two dimensional warranties, Proceedings of International Conference on Computers and Industrial Engineering, CIE, Vol. 2, pp. 824-834. (Internasional)
  • Van Der Heijden, M., Iskandar, B.P. (2013) Last time buy decisions for products sold under warranty, European Journal of Operational Research, Vol. 224, Issue 2, pp. 302-312. DOI: 10.1016/j.ejor.2012.07.041(Internasional)
  • Iskandar, B.P., Jack, N., Murthy, D.N.P. (2012) Two new servicing strategies for products sold with warranty, Asia-Pacific Journal of Operational Research, Vol. 29, Issue 3, Art. No. 1240022. DOI: 10.1142/S0217595912400222(Internasional)
  • Makmoen, M., Cakravastia, A., Irianto, D., Iskandar, B.P. (2012) Servicing strategy and preventive maintenance for products sold with one-dimensional warranties, IEEE International Conference on Industrial Engineering and Engineering Management, Art. No. 6838150, pp. 2264-2267. DOI: 10.1109/IEEM.2012.6838150(Internasional)
  • Nursanti, E., Maruf, A., Simatupang, T., Iskandar, B.P. (2012) Cost and availability functions using imperfect maintenance policy for a serial system, ISBEIA 2012-IEEE Symposium on Business, Engineering and Industrial Applications, Art. No. 6422911, pp. 386-391. DOI: 10.1109/ISBEIA.2012.6422911(Internasional)
  • Pasaribu, U.S., Husniah, H., Iskandar, B.P. (2012) Renewal process in two-dimensional repairable products, AIP Conference Proceedings, Vol. 1450, pp. 37-42. DOI: 10.1063/1.4724115(Internasional)
  • Pasaribu, U.S., Husniah, H., Iskandar, B.P. (2012) Stochastic system in discrete preventive maintenance and service contract, Proceedings of 2012 IEEE Conference on Control, Systems and Industrial Informatics, ICCSII 2012, Art. No. 6470510, pp. 250-254. DOI: 10.1109/CCSII.2012.6470510(Internasional)
  • Husniah, H., Pasaribu, U.S., Halim, A.H., Iskandar, B.P. (2011) A maintenance service contract for a warranted product, IEEE International Conference on Industrial Engineering and Engineering Management, Art. No. 6118182, pp. 1577-1581. DOI: 10.1109/IEEM.2011.6118182(Internasional)
  • Jack, N., Iskandar, B.P., Murthy, D.N.P. (2009) A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty, Reliability Engineering and System Safety, Vol. 94, Issue 2, pp. 611-617. DOI: 10.1016/j.ress.2008.06.019(Internasional)
  • Saraswati, D., Cakravastia, A., Iskandar, B.P., Halim, A.H. (2009) Joint economic lot size model with quality improvement for a single supplier and a single buyer cooperative collaboration, IEEM 2009-IEEE International Conference on Industrial Engineering and Engineering Management, Art. No. 5373219, pp. 1956-1960. DOI: 10.1109/IEEM.2009.5373219(Internasional)
  • Iskandar, B.P., Murthy, D.N.P., Jack, N. (2005) A new repair-replace strategy for items sold with a two-dimensional warranty, Computers and Operations Research, Vol. 32, Issue 3, pp. 669-682. DOI: 10.1016/j.cor.2003.08.011(Internasional)
  • Iskandar, B.P., Murthy, D.N.P. (2003) Repair-Replace Strategies for Two-Dimensional Warranty Policies, Mathematical and Computer Modelling, Vol. 38, Issue 41579, pp. 1233-1241. (Internasional)
  • Jack, N., Murthy, D.N.P., Iskandar, B.P., Chen, T.-M., Popova, E. (2003) Comments on maintenance policies with two-dimensional warranty, Reliability Engineering and System Safety, Vol. 82, Issue 1, pp. 105-111. DOI: 10.1016/S0951-8320(03)00119-4(Internasional)
  • Iskandar, B.P., Sandoh, H. (2000) An extended opportunity-based age replacement policy, RAIRO-Operations Research, Vol. 34, Issue 2, pp. 145-154. (Internasional)
  • Iskandar, B.P. (1999) An opportunity-based age replacement policy considering warranty, International Journal of Reliability, Quality and Safety Engineering, Vol. 6, Issue 3, pp. 229-236. (Internasional)
  • Murthy, D.N.P., Iskandar, B.P., Wilson, R.J. (1995) Two-dimensional failure-free warranty policies: Two-dimensional point process models, Operations Research, Vol. 43, Issue 2, pp. 356-366. (Internasional)
  • Murthy, D.N.P., Iskandar, B.P., Wilson, R.J. (1992) A simulation approach to analysis of free replacement policies, Mathematics and Computers in Simulation, Vol. 33, Issue 42526, pp. 513-518. DOI: 10.1016/0378-4754(92)90146-8(Internasional)
  • Murthy, D.N.P., Iskandar, B.P. (1991) A new shock damage model: Part I-Model formulation and analysis, Reliability Engineering and System Safety, Vol. 31, Issue 2, pp. 191-208. DOI: 10.1016/0951-8320(91)90118-Q(Internasional)
  • Murthy, D.N.P., Iskandar, B.P. (1991) A new shock damage model: Part II-Optimal maintenance policies, Reliability Engineering and System Safety, Vol. 31, Issue 2, pp. 211-231. DOI: 10.1016/0951-8320(91)90121-M(Internasional)
  • Murthy, D.N.P., Iskandar, B.P. (1991) Reply by Murthy & Iskandar, Reliability Engineering and System Safety, Vol. 31, Issue 2, pp. 238-. (Internasional)
  • Murthy, D.N.P., Iskandar, B.P. (1991) Reply to veselys comments on a new shock damage model: Part I-Model formulation and analysis, Reliability Engineering and System Safety, Vol. 31, Issue 2, pp. 210-. (Internasional)
  • Murthy, D.N.P., Iskandar, B.P. (1991) Reply to veselys comments on a new shock damage model: Part II-Optimal maintenance policies, Reliability Engineering and System Safety, Vol. 31, Issue 2, pp. 236-237. (Internasional)